Data Hall / Container
- Container data-hall hardware spec
- Structural capacity: 60 t
- Three-tier architecture
- Anti-corrosion / anti-rust coating
- Acoustic and thermal insulation
- Integrated spatial layout
Data Hall, Power, Water. Define specifications and design conditions first, then integrate the complete solution.
Data hall, power and water blocks engineered as one connected component set.
Monitoring and management layer configured before the hardware leaves the factory.
Modules integrated and tested as a system, not first assembled on site.
Integration & Delivery. Installation, services and facility operations follow the same rule: define Data Hall, Power and Water first, then integrate the complete data-center solution.
From structure, liquid cooling and thermal airflow to overseas certification. Standard containers are customized for data-center requirements, including overseas, high-spec and coastal high-salt-fog deployments.
Modular structure configurable for equipment and space.
Cooling equipment, CDU and piping integration.
Thermal-flow analysis verifies heat rejection.
Corrosion, salt-fog and special-environment protection.
Stacking and joining control tolerance before weather, structure and services, enabling rapid site assembly. An outdoor containerized solution built around anti-corrosion, thermal insulation and rapid on-site installation.
Wind, seismic, flood and enclosure requirements are translated into structural, equipment and site-interface protections. Reference basis: AI PMDC engineered for Thailand's most demanding environmental conditions.
N+1 redundant CDU-based liquid cooling system, supporting efficient coolant circulation, high-performance heat exchange and optimized thermal management.
High-density AI servers, network equipment, precision power, power distribution and monitoring, protected by reinforced enclosure and elevated base structure.
Every figure above is a design condition, not a marketing claim. Each one traces back to a Thai code or an IEC standard, and each is verified on the finished module.